bloovis.com

FirstDay Cottage

Pictures of our FirstDay Cottage building project. We started the project in May 2012, and finished the interior in mid-September 2013.

Click on a picture to see a larger version.

South Elevation

House Site

Foundation forms

Foam and plumbing

Radiant tubes

Poured slab

First load

Tarp tent

Stacks

Sill plates

Utility trench

Septic tank

Greenhouse

Floor beams

Beam support posts

First floor decking

Backfill

Drainage joint

Two-story goalposts

Two-story rafters

Sheathing

One story rafters

Rafters and sheathing

One story roof

Bucket loader

Scaffolds

First siding

Staircases

Front door

Siding over one story

Stove pad

Upper staircase

Corner trim

Siding completed

Siding in sun

Staircase framing

Interior framing

Drum sander

Fly tracks

Chimney pipe

Sanded vs. unsanded

PolyWhey

Window sill construction

Window sill closeup

Wiremold transition

Wiremold hole cover

Junction box

First autumn

Pantry wiring

Kitchen track lights

Dragonfly light

Metal man light

Ceiling lamps

Radon pipe at slab

Radon pipe on ceiling

Radon pipe exit

Radon fan

Radon pipe exterior

Piano room

First story view

Bathtub

Bathroom sink

Desk in hallway

Kitchen and dining section

Living room section

Dining nook

Pantry

Stairs and railings

Bedroom

Looms

Upstairs bath

Upstairs bedroom

Back to Photo Gallery